top of page

The One on Lawson in West Vancouver

Full Renovation

GCDC CP (6).png

We executed a large-scale renovation that included removing walls to open up the living space and converting the closed kitchen to an open design. We extended the drop ceiling and fully renovated the bathrooms. Closet systems were upgraded, new lighting systems were installed, and the kitchen received a complete upgrade. The entire floor was replaced, and all doors were replaced with taller, custom designs. Additionally, an AC/cooling system was added for comfort.

List of Project Upgrades:

  • Living room layout modification

  • Wall removal and space opening

  • Closed kitchen to open kitchen conversion

  • Drop ceiling extension

  • Full bathroom renovation

  • Closet system upgrade

  • Lighting system upgrade

  • Kitchen renovation

  • Flooring replacement

  • Full-unit painting

  • Door replacement with taller doors

  • AC/cooling system installation

Office:

ADB Group & Barmani Construction

The Final Look

The finished space, brought to life

Making It Happen

Capturing the transformation as it unfolds.

Where We Began

A glimpse of the space before our work began.

GCDC C (33).png
GC Reno (25).png

Before / After

bottom of page